Step1

Mar 14th , 9:18 pm

  • VCT and LVT installed over part Terrazzo and concrete.
  • ASTM 2170 Insitu RH >95%
Case Studies
Step2

Mar 14th ,

Gondolas jacked out of the way and floor scraped with a Terminator machine

Case Studies
Step3

Mar 14th ,

  • 780 Diamatic, 3 head grinder (220v) with vacuum attachment over terrazzo and concrete.
Case Studies
Step4

Mar 14th ,

  • Section is set initially in wet adhesive in a Walk-Off-Work method
  • After 20-25 min flash then rolled with 100lb roller
  • This section of flooring is going over terrazzo tile
Case Studies
Step5

Mar 14th ,

  • 6 Months Later
Case Studies
Step6

Mar 14th ,

  • The installation occurred at night without disruption to daylight retail activity. This saved Rite-Aid $1,000’s in lost revenue and wages.
Case Studies
Step1

Sep 8th , 9:37 pm

  • Installation of 3,591sf – 10hr process including floor wax
  • Mechanical demo with propane power
  • Pictured approx 20min after 9:00 time
Case Studies
Step2

Sep 8th , 9:54 pm

  • Mechanical demo with propane power
Case Studies
Step3

Sep 8th , 9:56 pm

  • Evidence of Near Surface Aggregate Reaction (NSAR) after removal of existing floor
Case Studies
Step4

Sep 8th , 10:41 pm

  • SASE PDG 8000 460v floor grinder with vacuum attachments – store provided power source
Case Studies
Step5

Sep 8th , 10:44 pm

Case Studies
Step6

Sep 8th , 10:54 pm

Case Studies
Step7

Sep 8th , 11:05 pm

Case Studies
Step8

Sep 8th , 11:07 pm

  • Grinding in process to remove all adhesive and or epoxy coatings
Case Studies
Step9

Sep 9th , 11:20 pm

Case Studies
Step10

Sep 9th , 4:59 am

  • Completed grind
Case Studies
Step11

Sep 9th , 7:18 am

  • Reno’s Technique – Starting a 6′ wide ribbon section of adhesive the length of the space
  • Installation working off the tile from both sides
  • Setting 10mins after trowel
Case Studies
Step12

Sep 9th , 7:45 am

  • Second 6′ ribbon section being spread as first section is completed
  • Rolling the floor 30mins after set or 40mins after trowel
  • Adhesive being spread along chalk line
Case Studies
Step13

Sep 9th , 7:47 am

  • Ribbon Technique – finishing 2nd 6′ ribbon section working off the tile
  • Installers begin in stagger with second installer laying tile after first
Case Studies
Step14

Sep 9th , 9:16 am

Case Studies
Step15

Sep 9th , 11:58 am

  • Application of Walmart supplied floor wax 4hrs after installation
Case Studies
Step16

Sep 9th , 12:35 am

  • 3,591sf completed floor including wax in a total time of just over 10hrs
Case Studies
Step1

Aug 4th , 9:00 pm

Case Studies
Step2

Aug 4th , 9:26 pm

Case Studies
Step3

Aug 4th , 9:41 pm

Case Studies
Step4

Aug 4th , 10:02 pm

Case Studies
Step5

Aug 4th , 10:32 pm

Case Studies
Step6

Aug 4th , 11:12 pm

Case Studies
Step7

Aug 4th , 11:16 pm

Case Studies
Step8

Aug 4th , 11:25 pm

Case Studies
Step9

Aug 4th , 11:47 pm

Case Studies
Step10

Aug 5th , 12:15 am

Case Studies
Step11

Aug 5th , 12:26 am

Case Studies
Step12

Aug 5th , 1:38 am

Case Studies
Step13

Aug 5th , 2:14 am

Case Studies
Step14

Aug 5th , 11:50 am

Case Studies
  • Rite Aid - Capo Beach, CA
      • Rite Aid - Capo Beach, CA
    • Step1

      Mar 14th , 9:18 pm

      • VCT and LVT installed over part Terrazzo and concrete.
      • ASTM 2170 Insitu RH >95%
      Case Studies
      Step2

      Mar 14th ,

      Gondolas jacked out of the way and floor scraped with a Terminator machine

      Case Studies
      Step3

      Mar 14th ,

      • 780 Diamatic, 3 head grinder (220v) with vacuum attachment over terrazzo and concrete.
      Case Studies
      Step4

      Mar 14th ,

      • Section is set initially in wet adhesive in a Walk-Off-Work method
      • After 20-25 min flash then rolled with 100lb roller
      • This section of flooring is going over terrazzo tile
      Case Studies
      Step5

      Mar 14th ,

      • 6 Months Later
      Case Studies
      Step6

      Mar 14th ,

      • The installation occurred at night without disruption to daylight retail activity. This saved Rite-Aid $1,000’s in lost revenue and wages.
      Case Studies
  • Walmart - Phoenix, AZ
      • Walmart - Phoenix, AZ
    • Step1

      Sep 8th , 9:37 pm

      • Installation of 3,591sf – 10hr process including floor wax
      • Mechanical demo with propane power
      • Pictured approx 20min after 9:00 time
      Case Studies
      Step2

      Sep 8th , 9:54 pm

      • Mechanical demo with propane power
      Case Studies
      Step3

      Sep 8th , 9:56 pm

      • Evidence of Near Surface Aggregate Reaction (NSAR) after removal of existing floor
      Case Studies
      Step4

      Sep 8th , 10:41 pm

      • SASE PDG 8000 460v floor grinder with vacuum attachments – store provided power source
      Case Studies
      Step5

      Sep 8th , 10:44 pm

      Case Studies
      Step6

      Sep 8th , 10:54 pm

      Case Studies
      Step7

      Sep 8th , 11:05 pm

      Case Studies
      Step8

      Sep 8th , 11:07 pm

      • Grinding in process to remove all adhesive and or epoxy coatings
      Case Studies
      Step9

      Sep 9th , 11:20 pm

      Case Studies
      Step10

      Sep 9th , 4:59 am

      • Completed grind
      Case Studies
      Step11

      Sep 9th , 7:18 am

      • Reno’s Technique – Starting a 6′ wide ribbon section of adhesive the length of the space
      • Installation working off the tile from both sides
      • Setting 10mins after trowel
      Case Studies
      Step12

      Sep 9th , 7:45 am

      • Second 6′ ribbon section being spread as first section is completed
      • Rolling the floor 30mins after set or 40mins after trowel
      • Adhesive being spread along chalk line
      Case Studies
      Step13

      Sep 9th , 7:47 am

      • Ribbon Technique – finishing 2nd 6′ ribbon section working off the tile
      • Installers begin in stagger with second installer laying tile after first
      Case Studies
      Step14

      Sep 9th , 9:16 am

      Case Studies
      Step15

      Sep 9th , 11:58 am

      • Application of Walmart supplied floor wax 4hrs after installation
      Case Studies
      Step16

      Sep 9th , 12:35 am

      • 3,591sf completed floor including wax in a total time of just over 10hrs
      Case Studies
  • Walmart - Owatonna, MN
      • Walmart - Owatonna, MN
    • Step1

      Aug 4th , 9:00 pm

      Case Studies
      Step2

      Aug 4th , 9:26 pm

      Case Studies
      Step3

      Aug 4th , 9:41 pm

      Case Studies
      Step4

      Aug 4th , 10:02 pm

      Case Studies
      Step5

      Aug 4th , 10:32 pm

      Case Studies
      Step6

      Aug 4th , 11:12 pm

      Case Studies
      Step7

      Aug 4th , 11:16 pm

      Case Studies
      Step8

      Aug 4th , 11:25 pm

      Case Studies
      Step9

      Aug 4th , 11:47 pm

      Case Studies
      Step10

      Aug 5th , 12:15 am

      Case Studies
      Step11

      Aug 5th , 12:26 am

      Case Studies
      Step12

      Aug 5th , 1:38 am

      Case Studies
      Step13

      Aug 5th , 2:14 am

      Case Studies
      Step14

      Aug 5th , 11:50 am

      Case Studies

Your All-In-One Waterproof Flooring
Solution Is Only A Click Away